{"product_id":"cordial-cfy3-wcc-long-lead-3m-3-5mm-trs-to-dual-rca-long-split","title":"CORDIAL CFY3 WCC LONG LEAD 3M 3.5MM TRS TO DUAL RCA - LONG SPLIT","description":"\u003cp\u003eThe Y-adapter CFY WCC-LONG (mini stereo jack to 2 x RCA) is used, for example, to connect a smartphone to two RCA inputs that are far away from each other. The extremely precise REAN® by NEUTRIK® brand plugs are long-lasting and protected by anti-kink sleeves. The contacts are gold-plated and thus protected against corrosion.\u003c\/p\u003e\n\u003cp\u003eAnother special feature is the Y-piece manufactured exclusively for Cordial. Its special design provides additional strain relief and bend protection at the sensitive separation point of the cable.\u003c\/p\u003e\n\u003cp\u003eApprox. 15 cm before the split\u003c\/p\u003e\n\u003cp\u003eLength: 3m\u003c\/p\u003e","brand":"Group Technologies","offers":[{"title":"Default Title","offer_id":44869055742083,"sku":"","price":35.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0380\/6724\/1091\/files\/Photoroom_006_20241104_140500.jpg?v=1730700747","url":"https:\/\/soundtownav.com.au\/products\/cordial-cfy3-wcc-long-lead-3m-3-5mm-trs-to-dual-rca-long-split","provider":"Soundtown","version":"1.0","type":"link"}